[Federal Register: January 31, 2003 (Volume 68, Number 21)]
[Notices]               
[Page 5018-5019]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr31ja03-77]                         


=======================================================================
-----------------------------------------------------------------------


ENVIRONMENTAL PROTECTION AGENCY


[ER-FRL-6637-2]


 
Environmental Impact Statements; Notice of Availability


    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.epa.gov/compliance/nepa.


Weekly receipt of Environmental Impact Statements
Filed January 20, 2003 Through January 24, 2003
Pursuant to 40 CFR 1506.9.


EIS No. 030032, FINAL EIS, NPS, CA, Santa Monica Mountains National 
Recreation Area General Management Plan, Implementation, Los Angeles 
and Ventura Counties, CA, Wait Period Ends: March 3, 2003, Contact: 
Allan Schmierer (510) 817-1441.
EIS No. 030033, FINAL SUPPLEMENT, COE, OR, WA, Columbia River Channel 
Improvement Project, Additional Information to Update the Disposal Plan 
and to Update the Project Economics, Columbia and Lower Williamette 
River Federal Navigation Channel, OR, Wait Period Ends: March 3, 2003, 
Contact: Laura Hicks (503) 808-4705.
EIS No. 030034, DRAFT EIS, AFS, CA, Stream Fire Restoration Project, 
Implementation, Plumas National Forest, Mt. Hough Ranger District, 
Plumas County, CA, Comment Period Ends: March 17, 2003, Contact: Rich 
Bednarski (520) 283-7641.
EIS No. 030035, DRAFT SUPPLEMENT, JUS, CA, Pinal County Private 
Detention Facility, Updated Information, Single Contact for 3,000 Beds 
Possible Sites (1) Undeveloped Parcel of Land in the City of Eloy and 
the Existing Central Arizona Detention Center Located in Florence, 
Pinal County, AZ, Comment Period Ends: March 17, 2003, Contact: Charles 
Coburn (202) 307-9045.
EIS No. 030036, FINAL SUPPLEMENT, NRC, PA, Peach Bottom Atomic Power 
Station Unit 2 and 3, Renewal of the Operating License for Nuclear 
Plants, NUREG-1437 Supplement 10 Located on the Banks of the 
Susquehanna River, York County, PA, Wait Period Ends: March 3, 2003, 
Contact: Duke Wheeler (301) 414-1444.
EIS No. 030037, FINAL EIS, FHW, IL, MO, Chicago-St. Louis High-Speed 
Rail Project, Improvement from Chicago to St. Louis to enhance the 
Passenger Transportation Network, NPDES Permit and COE Section 404 
Permit, Cook, Will, Kankakee Grundy, Livington, McLean, Sangemon, 
Macoupin, Jersey, Madison and St. Louis Counties, IL and St. Louis 
County, MO, Wait Period Ends: March 10, 2003, Contact: Norman R. 
Stoner, P.E. (217) 492-4640.
EIS No. 030038, FINAL EIS, FHW, WA, WA-509 Extension/South Access Road 
Corridor Project, Construction, Funding and Possible COE Section 404 
Permit, the Cities of SeaTac, Des Moines, Kent and Federal Way, King 
County, WA, Wait Period Ends: March 3, 2003, Contact: James Christian 
(306) 753-9480.
EIS No. 030039, FINAL EIS, BLM, OR, Lakeview Resource Management Plan, 
Unified Land Use Plan to Replace All or Portions of Three nearly Twenty 
Year Old Existing Land Use Plans, Implementation, Lake and Bend 
Counties, OR, Wait Period Ends: March 3, 2003, Contact: Paul Whitman 
(541) 947-6110.


[[Page 5019]]


EIS No. 030040, DRAFT EIS, AFS, WI, Hoffman-Sailor West Project, 
Proposal for Timber Harvest, Regeneration Activities, Connected Road 
Construction and Decommissioning Chequamegon-Nicolet National Forest, 
Medford/Park Falls Ranger District, Price County, WI, Comment Period 
Ends: March 17, 2003, Contact: Jane Darnell (715) 748-4875.
EIS No. 030041, FINAL EIS, EPA, FL, Peace River/Manasota Regional 
Surface Water Supply Authority's Surface Water Supply, Storage and 
Interconnect Project, Construction and Operation to Increase Finished 
Water Delivery Capacity of 32.7 Million Gallons Per Day To Meet Year 
2015 Potable Water Demand, DeSoto, Manatee, Sarasota and Charlotte 
Counties, FL, Wait Period Ends: March 3, 2003, Contact: John Hamilton 
(404) 562-9617.
EIS No. 030042, FINAL EIS, DOE, WA, Schultz-Hanford Transmission Line 
Project, New 500 kilovolt (kV) Transmission Line Construction, Central 
Washington, north of Hanford connecting to existing line at the Schultz 
Substation, Kittitas, Yakima, Grant and Benton Counties, WA, Wait 
Period Ends: March 3, 2003, Contact: Nancy Wittpenn (503) 230-3297.
EIS No. 030043, FINAL EIS, JUS, CA, Sacramento County Juvenile Hall 
Expansion Project, To Accommodate 90 new beds in the Short-Term, and 
240 new beds in the Long-Term, Sacramento County, CA, Wait Period Ends: 
March 3, 2003, Contact: John Veen (202) 616-2251.
EIS No. 030044, DRAFT EIS, FRC, WY, MT, ND, Grasslands Pipeline 
Project, Construct and Operate an Interstate Natural Gas Pipeline 
System, Docket No. CP02-037-000, WY, ND and MT, Comment Period Ends: 
March 17, 2003, Contact: Rich McGuire (202) 502-6177. This document is 
available on the Internet at: http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.ferc.gov.
EIS No. 030045, FINAL SUPPLEMENT, BLM, NV, Betze-Post Project, Updated 
Information, Dewatering Operations and a Proposed Pipeline, Elko and 
Eureka Counties, NV, Wait Period Ends: March 3, 2003, Contact: Kirk 
Laird (775) 753-0272.


    Dated: January 28, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-2345 Filed 1-30-03; 8:45 am]

BILLING CODE 6560-50-P