ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6637-5]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at (202) 564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in the Federal Register dated April 12, 2002 (67 FR 17992).
Draft EISs
ERP No. D-AFS-F65034-WI Rating LO, Northwest Howell Project, Timber
Harvest, Wildlife Openings Maintenance, Aspen and Jack Pine Types
Regeneration, Hardwood and Conifer Tree Seedilings Protection, Lakes
Habitat Improvements and Transportation System Development, Eagle-
Florence District, Chequameg-Nicolet National Forest, Forest and
Florence Counties, WI.
Summary: EPA has no objections to this vegetation management plan
since the design features in the project should function to avoid and
reduce potential impacts.
ERP No. D-AFS-F65035-WI Rating LO, Cayuga Project Area, Various
Resource Management Projects, Chequamegon-Nicolet National Forest,
Great Divide Ranger District, Ashland County, WI.
Summary: EPA has no objections to the preferred alternative, we
believe Alternative 4 is environmentally preferable because of its
emphasis on long-term ecosystem health over the desires of forest
resource consumers.
ERP No. D-AFS-G65085-NM Rating EC2, Sacramento, Dry Canyon and
Davis Grazing Allotments, Authorization of Livestock Grazing
Activities, Lincoln
[[Page 6450]]
National Forst, Sacramento Ranger District, Otero County, NM.
Summary: EPA expressed environmental concerns and requested
additional information to address and mitigate potential impacts to
federally protected species under the Endangered Species Act.
ERP No. D-BLM-K09808-NV Rating LO, Ivanpah Energy Center Project,
500 Megawatt (MW) Gas-Fired Electric Power Generating Station
Construction and Operation, Approval, Right-of-Way Grant, BLM Temporary
Use Permit, FHWA Permit to Cross Federal Aid Highway, U.S. Army COE
Section 10 and 404 Permits and NPDES Permit Issuance, Clark County, NV.
Summary: EPA expressed a lack of objections with the proposed
action.
ERP No. D-BLM-L65407-OR Rating EC2, Lookout Mountain Forest and
Rangeland Health Project and Baker Resource Management Plan (RMP)
Amendment involving Changes in Visual Resources Management (VRM)
Inventory Classes and Decommissioning of Roads, Implementation, Baker
City, Baker County, OR.
Summary: EPA expressed environmental concerns with the lack of
specific information on noxious weed treatment, and potential impacts
to air quality from prescribed burns.
ERP No. D-JUS-K80044-CA Rating LO, Sacramento County Juvenile Hall
Expansion Project, Accommodation of 90 New Beds in the Short-Term and
240 New Beds in the Long-Term, Sacramento County, CA.
Summary: EPA has no objection to the proposed action since the DEIS
provided an adequate analysis of potential impacts, and all potentially
significant impacts have been mitigated or accounted for.
ERP No. DS-COE-E36154-FL Rating LO, Upper St. Johns River Basin and
Related Areas, Central and Southern Florida Flood Control Project, New
Information concerning Preservation and Enhancement of Floodplain and
Aquatic Habitats North of the Fellsmere Grade, Brevard County, FL
Summary: While future monitoring and some changes may be necessary
to determine the degree of successful marsh enhancement resulting from
these water manipulations, EPA has no environmental objections to its
implementation.
Final EISs
ERP No. F-COE-E35086-FL, Fort Pierce Shore Protection Project,
Future Dredging of Capron Shoal, Implementation, St. Lucie County, FL.
Summary: EPA determined that the unavoidable losses attendant to
implementation of this project have been appropriately mitigated,
therefore EPA has no objection to the proposed action.
ERP No. F-DOE-L05224-WA, Maiden Wind Farm Project, Construction and
Operation of up to 494 Megawatts (MW) of Wind Generation on Privately-
and Publicly-owned Property, Conditional Use Permits, Rattlesnake
Hills, Benton and Yakima Counties, WA.
Summary: No formal comment letter was sent to the preparing agency.
ERP No. F-NPS-K61152-CA, Santa Monica Mountains National Recreation
Area General Management Plan, Implementation, Los Angeles and Ventura
Counties, CA.
Summary: No formal comment letter was sent to the preparing agency.
ERP No. F-USA-E11050-KY, Blue Grass Army Depot, Destruction of
Chemical Munitions, Design, Construction, Operation and Closure of a
Facility to Destroy the Chemical Agent and Munitions, Madison County,
KY.
Summary: EPA has no objection to the proposed action or the various
technologies which will be used to accomplish this objective.
Dated: February 4, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.