ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6680-4]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 7, 2006 (71 FR 17845).
Draft EISs
EIS No. 20060278, ERP No. D-NOA-A91074-00, North Atlantic Right Whale
Ship Strike Reduction Strategy, To Implement the Operational Measures
to Reduce the Occurrence and Severity of Vessel Collisions with the
Right Whale, Serious Injury and Deaths Resulting from Collisions with
Vessels.
Summary: While EPA believes Alternative 5 is the environmentally
preferred alternative, EPA does not object to the proposed action.
Rating LO.
EIS No. 20060315, ERP No. D-AFS-K65317-CA, Antelope-Pardee 500kV
Transmission Project, Construct, Operate and Maintain a New 25.6-mile
500kV Transmission Line, Right-of-Way Permit and Special Use
Authorization, Angeles National Forest, Los Angeles County, CA.
Summary: EPA expressed environmental concerns about potential
impacts to air quality, significant and unavoidable cumulative impacts
to multiple resources and noise impacts on sensitive receptors. The
FEIS should identify and commit to additional mitigation measures for
these impacts.
Rating EC2.
EIS No. 20060343, ERP No. D-WPA-J08027-SD, White Wind Farm Project,
Construct a Large Utility-Scale Wind-Powered Electric Energy Generating
Facility, Sherman Township, Brookings County, SD.
Summary: While EPA does not object to the proposed action,
clarification of mitigation that could be implemented to reduce bird/
bat mortality in the project area is requested.
Rating LO.
EIS No. 20060338, ERP No. DS-FHW-J40135-MT, U.S. 93 Highway
[[Page 61967]]
Ninepipe/Ronan Improvement Project, from Dublin Gulch Road/Red Horn
Road, Funding, Special-Use-Permit, NPDES Permit and U.S. Army COE
Section 404 Permit, Lake County, MT.
Summary: EPA expressed environmental concerns about impacts to
wetlands and aquatic habitat, as well as impacts to wildlife and
wildlife movement, including the threatened grizzly bear. EPA requested
additional information and mitigation on these issues.
Rating EC2.
Final EISs
EIS No. 20060377, ERP No. F-FRC-L05235-WA, Baker River Hydroelectric
Project, Application to Relicense the Upper Baker and Lower Baker
Developments, Mt. Baker-Snoqualmie National Forest, Baker River,
Whatcom and Skagit Counties, WA.
Summary: No formal comment letter was sent to the preparing agency.
Dated: October 17, 2006.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E6-17565 Filed 10-19-06; 8:45 am]