[Federal Register: July 3, 2006 (Volume 71, Number 127)]
[Proposed Rules]
[Page 37874-37880]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr03jy06-19]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Minerals Management Service
30 CFR Part 250
RIN 1010-AD18
Oil and Gas and Sulphur Operations in the Outer Continental Shelf
(OCS)--Revisions to Subpart A--General; Subpart I--Platforms and
Structures; and Subpart J--Pipelines and Pipeline Rights-of-Way
AGENCY: Minerals Management Service (MMS), Interior.
ACTION: Proposed rule.
-----------------------------------------------------------------------
SUMMARY: MMS is proposing to amend its regulations to require lessees,
lease operators, and pipeline right-of-way (ROW) holders to submit
assessment information on the structural integrity of their OCS
platforms each year, and to submit an inspection program to MMS yearly.
Also, a damage report would be required if a facility or pipeline was
damaged by a hurricane or other natural phenomena. Lessees, lease
operators, and pipeline ROW holders proposing to use unbonded flexible
pipe for pipelines, or to install pipeline risers on floating
platforms, would have to provide additional information on their
projects. The proposed rule also would incorporate an industry-
developed standard concerning the in-service inspection of mooring
hardware for floating drilling units. These proposed changes would
allow MMS to better regulate the safety of the oil and gas
infrastructure, and to promptly assess damage resulting from hurricanes
or other natural phenomena.
DATES: Submit comments by September 1, 2006. MMS may not fully consider
comments received after this date. Submit comments to the Office of
Management and Budget on the information collection burden in this
rulemaking by August 2, 2006.
ADDRESSES: You may submit comments on the rulemaking by any of the
following methods. Please use the Regulation Identifier Number (RIN)
1010-AD18 as an identifier in your message. See also Public Comment
Procedures under Procedural Matters.
MMS's Public Connect on-line commenting system, http://ocsconnect.mms.gov.
Follow the instructions on the Web site for
submitting comments.
Federal eRulemaking Portal: http://www.regulations.gov.
Follow the instructions on the Web site for submitting comments.
E-mail MMS at rules.comments@mms.gov. Use the RIN 1010-
AD18 in the subject line.
Fax: 703-787-1546. Identify with the RIN, 1010-AD18.
Mail or hand-carry comments to the Department of the
Interior; Minerals Management Service; Attention: Rules Processing Team
(RPT); 381 Elden Street, MS-4024; Herndon, Virginia 20170-4817. Please
reference 1010-AD18 in your comments and include your name and return
address.
Send comments on the information collection in this rule
to: Interior Desk Officer 1010-AD18, Office of Management and Budget,
202/395-6566 (facsimile); e-mail: oira_docket@omb.eop.gov. Please also
send a copy to MMS.
FOR FURTHER INFORMATION CONTACT: Larry Ake, Regulations and Standards
Branch at (703) 787-1567.
SUPPLEMENTARY INFORMATION: On July 19, 2005, MMS published a final rule
(70 FR 41556) titled ``Fixed and Floating Platforms and Structures and
Documents Incorporated by Reference'' in the Federal Register. That
final rule expanded MMS regulations regarding the design, construction,
and operation of OCS facilities to include coverage of floating oil and
gas production platforms. The rule also incorporated by reference a
number of industry-developed standards pertaining to floating
platforms. During the process of developing and publishing that final
rule, comments were received, both from the public and internally
within MMS, that suggested additional requirements. MMS has since
reviewed the suggested changes and is incorporating those with the
greatest merit in this proposed rule.
The first of these proposed revisions was suggested by both the
Offshore Operator's Committee (OOC) and Shell Oil Company. They
suggested that MMS consider adopting American Petroleum Institute
Recommended Practice (API RP) 2I, ``In-Service Inspection of Mooring
Hardware for Floating Drilling Units.''
MMS agrees that API RP 2I, second edition, would be a valuable
industry standard to consider for incorporation by reference into 30
CFR part 250, subparts A and I. API RP 2I is specifically written to
address the inspection of mooring chain and wire rope for Mobile
Offshore Drilling Units (MODUs), which frequently move from location to
location. Moreover, the detailed information provided in API RP 2I on
failure modes, inspection methods, and repair methods also could be
useful in the development and implementation of the in-service
inspection plan required under Sec. 250.919(a) for other types of
offshore floating facilities that remain on station for longer periods
of time. Based on OOC's and Shell's recommendation, MMS has reviewed
API RP 2I, ``In-Service Inspection of Mooring Hardware for Floating
Drilling Units,'' and is proposing that it be incorporated by reference
into our regulations. MMS welcomes further industry comments on the
referencing of this document in subparts A and I.
Subpart I currently requires that lessees and operators develop an
in-service inspection plan for platforms (Sec. 250.919). The plan must
show in detail the type, extent, and frequency of the inspections
lessees and operators will conduct on platforms. The existing
regulation does not specify when the plan must be submitted to MMS for
approval. MMS is now proposing that the plan be submitted to the
Regional Supervisor for approval each year by April 1.
The proposed rule would add several requirements to subpart I,
Platforms and Structures, to reflect MMS's concerns about the aging
infrastructure on the OCS. These proposed new requirements are meant to
help ensure that lessees, lease operators, and pipeline ROW holders are
appropriately assessing their OCS structures to ascertain their fitness
for continued use. Included in the proposed revisions to Sec. 250.920
are the following: (1) A complete platform structural assessment
analysis if the platform meets one or more platform assessment
initiators; (2) platform mitigation actions, which must be approved by
the Regional Supervisor, if the platform does not pass the assessment;
(3) approval from the
[[Page 37875]]
Regional Supervisor before assessing a platform to either the medium or
low consequence-of-failure exposure category; and (4) MMS approval
before changing the use of the platform.
Also in subpart I, a proposed addition to the table contained at
Sec. 250.905 would require lessees and lease operators to submit a
summary of the safety factors utilized when designing their platforms.
This requirement was included in previous MMS regulations, but was
omitted in the recently published subpart I due to an oversight.
At Sec. 250.916(c), the third-party Certified Verification Agent
(CVA) currently must submit the final platform design report to the
Regional Supervisor before the fabrication phase begins. In addition,
Sec. 250.917(c) requires the CVA to submit the final fabrication
report before the beginning of the installation phase. Finally, Sec.
250.918(c) now requires the CVA to submit a final report covering the
adequacy of the installation phase within 30 days of the installation
of the platform. MMS recognizes that it may be difficult and
impractical for lessees and operators to meet these deadlines for some
projects. Therefore, the proposed rule would add language to require
operators to submit a complete schedule for platform design,
fabrication, and installation that shows when interim and final reports
will be submitted to MMS.
MMS often needs to obtain damage assessments and reports from
lessees, lease operators, and pipeline right-of-way holders after
events such as earthquakes or hurricanes. Proposed wording has been
added to subpart I at Sec. 250.919(c) and (d) concerning special
surveys of platforms that would be conducted in accordance with the
provisions of API RP 2A-WSD. MMS would require lessees, lease
operators, and pipeline right-of-way holders to provide MMS with the
schedule for, and results of, these special surveys.
A new proposed requirement also would be added to subpart A,
General, at Sec. 250.192, that would require lessees, lease operators,
and pipeline ROW holders to submit reports to MMS if their facilities
are damaged by a hurricane, earthquake, or other natural phenomenon. A
new form (Form MMS-143, Facility/Equipment Damage Report) has been
developed to assist lessees, lease operators, and pipeline ROW holders
when reporting this damage. Adding this requirement to the regulations,
with an Office of Management and Budget (OMB) approval for information
collection, would allow MMS to request damage information without the
delay of obtaining OMB approval for each event.
Additional requirements are also proposed for subpart J, Pipelines
and Pipeline Rights-of-Way. These proposed requirements would require
lessees, lease operators, and pipeline ROW holders to provide
additional information in their pipeline applications if they intend to
use unbonded flexible pipe or a pipeline riser with a floating
platform.
Procedural Matters
Public Comment Procedures
MMS's practice is to make comments, including the names and
addresses of respondents, available for public review. Individual
respondents may request that we withhold their addresses from the
rulemaking record, which we will honor to the extent allowable by law.
There may be circumstances in which we would withhold from the
rulemaking record a respondent's identity, as allowable by law. If you
wish us to withhold your name and/or address, you must state this
prominently at the beginning of your comment. However, MMS will not
consider anonymous comments. We will make all submissions from
organizations or businesses, and from individuals identifying
themselves as representatives or officials of organizations or
businesses, available for public inspection in their entirety.
Regulatory Planning and Review (Executive Order (E.O.) 12866)
This document is not a significant rule and does not require review
by OMB under E.O. 12866.
(1) This proposed rule would not have an effect of $100 million or
more on the economy. It would not adversely affect in a material way
the economy, productivity, competition, jobs, the environment, public
health or safety, or state, local, or tribal governments or
communities.
(2) This proposal would not create a serious inconsistency or
otherwise interfere with an action taken or planned by another agency.
(3) This proposed rule would not alter the budgetary effects of
entitlements, grants, user fees, or loan programs, or the rights or
obligations of their recipients; and has no effect on these programs or
such rights.
(4) This proposed rule would not raise novel legal or policy
issues.
Regulatory Flexibility Act (RFA)
The Department certifies that this proposed rule would not have a
significant economic effect on a substantial number of small entities
as defined under the RFA (5 U.S.C. 601 et seq.). Most of the costs for
complying with this proposed rule would be information collection
costs. The total estimated annual burden hours for responding to the
information collection requirements in this proposed rule are 87,347.
At an estimated cost of $50 per hour, the industry-wide cost for the
information collection burden in this proposed rule would be slightly
over four million dollars. Complying with the API RP 2I, ``In-Service
Inspection of Mooring Hardware for Floating Drilling Units,'' should
not be a financial burden since responsible companies already adhere to
the practices described in the document. For a proposed rule with these
relatively low projected costs to industry, a Regulatory Flexibility
Analysis is not required. Accordingly, a Small Entity Compliance Guide
is not required.
This proposed rule would apply to all lessees, lease operators, and
pipeline ROW holders operating on the OCS. MMS estimates that 130
lessees/operators explore for and produce oil and gas on the OCS.
Approximately 70 percent of them (91 companies) fall into the small
business category. MMS estimates that 207 companies currently hold
pipeline rights-of-way. Approximately 65 percent of them (135
companies) fall into the small business category.
Your comments are important. The Small Business and Agriculture
Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were
established to receive comments from small businesses about Federal
agency enforcement actions. The Ombudsman will annually evaluate the
enforcement activities and rate each agency's responsiveness to small
business. If you wish to comment on the enforcement actions of MMS,
call toll-free 1-(888) 734-3247.
Small Business Regulatory Enforcement Fairness Act (SBREFA)
This proposed rule is not a major rule under SBREFA (5 U.S.C.
804(2)). This proposed rule:
(a) Would not have an annual effect on the economy of $100 million
or more.
(b) Would not cause a major increase in costs or prices for
consumers, individual industries, Federal, state, or local government
agencies, or geographic areas.
(c) Would not have significant adverse effects on competition,
employment, investment, productivity, innovation, or the ability of
U.S.-based enterprises to compete with foreign-based enterprises.
[[Page 37876]]
Unfunded Mandates Reform Act (UMRA)
This proposed rule would not impose an unfunded mandate on state,
local, or tribal governments, or the private sector, of more than $100
million per year. The proposed rule would not have a significant or
unique effect on state, local, or tribal governments, or the private
sector. A statement containing the information required by the UMRA (2
U.S.C. 1531 et seq.) is not required.
Takings Implications Assessment (Executive Order 12630)
According to E.O. 12630, the proposed rule would not have
significant Takings implications. A Takings Implication Assessment is
not required.
Federalism (Executive Order 13132)
According to E.O. 13132, this proposed rule would not have
Federalism implications. The proposed rule would not substantially and
directly affect the relationship between the federal and state
governments, and would not impose costs on states or localities.
Civil Justice Reform (Executive Order 12988)
With respect to E.O. 12988, the Office of the Solicitor has
determined that this proposed rule would not unduly burden the judicial
system, and meets the requirements of sections 3(a) and 3(b)(2) of the
E.O.
Paperwork Reduction Act (PRA)
This proposed rule contains a collection of information that has
been submitted to OMB for review and approval under Sec. 3507(d) of
the PRA. As part of our continuing effort to reduce paperwork and
respondent burdens, MMS invites the public and other federal agencies
to comment on any aspect of the reporting and recordkeeping burden. If
you wish to comment on the information collection aspects of this
proposed rule, you may send your comments directly to the OMB (see the
ADDRESSES section of this notice). Please identify your comments with
1010-AD18. Send a copy of your comments to the Rules Processing Team
(RPT), Attn: Comments; 381 Elden Street, MS-4024; Herndon, Virginia
20170-4817. Please reference ``30 CFR 250, Oil and Gas and Sulphur
Operations in the Outer Continental Shelf-Revisions to Subpart A--
General; Subpart I--Platforms and Structures; and Subpart J--Pipelines
and Pipeline Rights-of-Way, 1010-AD18'' in your comments. You may
obtain a copy of the supporting statement for the new collection of
information by contacting the Bureau's Information Collection Clearance
Officer at (202) 208-7744.
The PRA provides that an agency may not conduct or sponsor, and a
person is not required to respond to, a collection of information
unless it displays a currently valid OMB control number. OMB is
required to make a decision concerning the collection of information
contained in these proposed regulations between 30 to 60 days after
publication of this document in the Federal Register. Therefore, a
comment to OMB is best assured of having its full effect if OMB
received it by August 2, 2006. This does not affect the deadline for
the public to comment to MMS on the proposed regulations.
The title of the collection of information for the rule is ``30 CFR
250, Oil and Gas and Sulphur Operations in the Outer Continental Shelf
(OCS)--Revisions to Subpart A--General; Subpart I--Platforms and
Structures; and Subpart J--Pipelines and Pipeline Rights-of-Way.''
Respondents are approximately 130 Federal OCS lessees, operators, and
their Independent Verification Agents or other third-party reviewers of
production facilities, as well as 207 pipeline right-of-way holders.
Responses to this collection are mandatory. The frequency of response
varies, but is primarily annual or as needed. The information
collection (IC) does not include questions of a sensitive nature. MMS
will protect proprietary information according to the Freedom of
Information Act (5 U.S.C. 522) and its implementing regulations (43 CFR
part 2), and 30 CFR 250.196, ``Data and information to be made
available to the public,'' and 30 CFR part 252, ``OCS Oil and Gas
Information Program.''
The collection of information required by the current subparts A,
I, and J of 30 CFR 250 are approved by OMB under control numbers 1010-
0114 (expiration October 31, 2007); 1010-0149 (expiration March 31,
2008); and 1010-0050 (expiration March 31, 2009), respectively.
MMS will use the information collected and records maintained under
subpart I to determine the fitness of aging infrastructure for
continued use, as well as to ensure that the in-service inspection plan
for platforms is submitted to the Regional Supervisor for approval each
year by April l. The information is necessary to determine that
platforms and structures are sound and safe for their intended purpose,
provide for the safety of personnel, and meet MMS standards for
pollution prevention. The information collected under subpart A would
require respondents to submit reports to MMS if their facilities are
damaged by a natural phenomenon (e.g., hurricane, earthquake). A new
Form MMS-143, Facility/Equipment Damage Report, was developed to assist
respondents when reporting this damage. MMS will use this information
to rapidly assess damage, and to project any disruption of oil and gas
production from the OCS after such an event. MMS will use the
information collected under subpart J to ensure that pipelines or
pipeline risers with floating platforms have been designed to handle
the environmental stresses put upon them (e.g., water currents,
mudslides).
When final regulations are promulgated, the new information
collection burdens for 30 CFR part 250 subparts A, I, and J will be
incorporated into their respective collections of information for those
regulations. Also, this rule and ICR modify and incorporate the hours
and requirements already approved in 1010-0164, expiration February 28,
2009; therefore, that collection will be discontinued when the final
regulations take effect.
The following table details the IC burden for the proposed new
requirements in subparts A, I, and J.
----------------------------------------------------------------------------------------------------------------
Average No. of
Citation 30 CFR 250 rule section Reporting and recordkeeping Hour burden annual Annual burden
and NTL(s) requirement responses hours
----------------------------------------------------------------------------------------------------------------
Subpart A
----------------------------------------------------------------------------------------------------------------
192(a)(3).......................... Inform MMS when you resume .166 600 100
production.
192(b)............................. Use Form MMS-143 to submit 4 100 400
an initial damage
evaluation report to the
Regional Supervisor within
48 hours after completing
initial damage assessment.
[[Page 37877]]
192(b)............................. Use Form MMS-143 to submit 1 400 400
subsequent damage reports
on a weekly basis until
the damaged structure or
equipment is returned to
service.
----------------------------------------------------------------------------------------------------------------
Subpart I
----------------------------------------------------------------------------------------------------------------
900(e)............................. Submit platform .5 140 70
installation date and the
final as-built location to
the Regional Supervisor
within 45 days after
platform installation.
905(i)............................. Provide a summary of safety .25 331 83
factors utilized in the
design of the platform.
911; 916; 917; 918................. Submit complete schedule of 40 15 600
all phases of design,
fabrication, and
installation with required
information; also submit
Gantt Chart with required
information.
919(a)............................. Submit annual inspection 250 130 32,500
plan to the Regional
Supervisor for approval.
919(c) NTL......................... After an environmental \1\ 12 150 1,800
event, submit to Regional
Supervisor initial report
followed by updates and
supporting information.
919(d) NTL......................... Submit results of 120 200 24,000
inspections; obtain MMS
approval before making
major repairs.
920(b)............................. Obtain approval from the 20 400 8,000
Regional Supervisor before
assessing your platform to
medium or low consequence
of failure exposure
category.
920(d)............................. Obtain approval from the 40 200 8,000
Regional Supervisor for
mitigation actions.
920(f)............................. Submit a list of all 40 130 5,200
platforms you operate, and
appropriate supporting
data, annually.
920(g)............................. Obtain approval from the 40 100 4,000
Regional Supervisor for
any change in the platform.
----------------------------------------------------------------------------------------------------------------
Subpart J
----------------------------------------------------------------------------------------------------------------
1007(a)(4)(i)(A); (B); (C)........ Provide specified 4 6 24
information in your
pipeline application if
using unbonded flexible
pipe.
1007(a)(4)(i)(D)................... Provide results of third 40 1 40
party IVA review in your
pipeline application if
using unbonded flexible
pipe.
1007(a)(4)(ii)..................... Provide specified 30 35 1,050
information in your
pipeline application.
-----------------------------------------------
Total Burden................... ........................... .............. 3,028 87,347
----------------------------------------------------------------------------------------------------------------
\1\ Initial update.
MMS specifically solicits comments on the following questions:
(a) Is the proposed collection of information necessary for MMS to
properly perform its functions, and will it be useful?
(b) Are the estimates of the burden hours of the proposed
collection reasonable?
(c) Do you have any suggestions that would enhance the quality,
clarity, or usefulness of the information to be collected?
(d) Is there a way to minimize the information collection burden on
those who are to respond, including the use of appropriate automated
electronic, mechanical, or other forms of information technology?
In addition, the PRA requires agencies to estimate the total annual
reporting and recordkeeping ``non-hour cost'' burden resulting from the
collection of information. We have not identified any, and we solicit
your comments on this item.
National Environment Policy Act (NEPA)
MMS has analyzed this proposed rule under NEPA and 516 Departmental
Manual 6, Appendix 10.4C, ``Issuance and/or modification of
regulations.'' This proposed rule would not constitute a major Federal
action significantly affecting the quality of the human environment,
and falls within the categorical exclusion of Appendix 10.4C(1) because
the impact of the proposed rule would be limited to administrative and
economic effects. A detailed statement under the NEPA is not required.
Energy Supply, Distribution, or Use (Executive Order 13211)
This proposed rule is not a significant rule and is not subject to
review by the Office of Management and Budget under E.O. 13211. The
proposed rule would not have a significant effect on energy supply,
distribution, or use because the costs due to the proposed increases in
reporting requirements will be very small when compared to the costs of
operating on the OCS. Thus, a Statement of Energy Effects is not
required.
Consultation With Indian Tribes (Executive Order 13175)
Under the criteria in E.O. 13175, we have evaluated this proposed
rule and determined that it has no potential effects on federally
recognized Indian tribes. There are no Indian lands or tribes on the
OCS.
Clarity of This Regulation
Executive Order 12866 requires each agency to write regulations
that are easy to understand. We invite your comments on how to make
this proposed rule easier to understand, including answers to questions
such as the following:
(1) Are the requirements in the proposed rule clearly stated?
[[Page 37878]]
(2) Does the proposed rule contain technical language or jargon
that interferes with its clarity?
(3) Does the format of the proposed rule (grouping and order of
sections, use of headings, paragraphing, etc.) aid or reduce its
clarity?
(4) Is the description of the proposed rule in the ``Supplementary
Information'' section of this preamble helpful in understanding the
rule? What else can we do to make the rule easier to understand?
Send a copy of any comments that concern how we could make this
rule easier to understand to: Office of Regulatory Affairs, Department
of the Interior, Room 7229, 1849 C Street, NW., Washington, DC 20240.
You may also e-mail the comments to this address: Exsec@ios.doi.gov.
List of Subjects in 30 CFR Part 250
Continental shelf, Environmental protection, Oil and gas
exploration, Pipelines, Public lands--rights-of-way, Reporting and
recordkeeping requirements.
Dated: June 19, 2006.
R.M. ``Johnnie'' Burton,
Director, Minerals Management Service, Exercising the delegated
authority of the Assistant Secretary, Land and Minerals Management.
For the reasons stated in the preamble, MMS proposes to amend 30
CFR part 250 as follows:
PART 250--LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER
CONTINENTAL SHELF
1. The authority citation for part 250 continues to read as
follows:
Authority: 43 U.S.C. 1331, et seq.; 31 U.S.C. 9701.
2. Section 250.192 and its title are revised to read as follows:
Sec. 250.192 What reports and statistics must I submit relating to a
hurricane, earthquake, or other natural occurrence?
(a) You must submit evacuation statistics to the Regional
Supervisor for a natural occurrence, such as an earthquake, a
hurricane, or tropical storm. Statistics include facilities and rigs
evacuated and the amount of production shut in for gas and oil. You
must:
(1) Submit the statistics by fax or e-mail (for activities in the
MMS GOM OCS Region, use Form MMS-132) as soon as possible when
evacuation occurs;
(2) Submit the statistics on a daily basis by 11 a.m., as
conditions allow, during the period of shut-in and evacuation;
(3) Inform MMS when you resume production; and
(4) Submit the statistics either by MMS district, or the total
figures for your operations in an MMS region.
(b) If your facility, production equipment, or pipeline is damaged
by a hurricane, tropical storm, earthquake, or other natural
occurrence, you must:
(1) Submit a report to the Regional Supervisor within 48 hours
after you complete your initial evaluation of the damage. You must use
Form MMS-143 to make this report and all subsequent reports. In the
report, you must:
(i) Name the items damaged (e.g., platform or other structure,
production equipment, pipeline);
(ii) Describe the damage and assess the extent of the damage
(major, medium, minor); and
(iii) Estimate the time it will take to replace or repair each
damaged structure and piece of equipment and return it to service.
(2) Submit subsequent reports on a weekly basis until the damaged
structure or equipment is returned to service. In the final report, you
must provide the date the item was returned to service.
3. Section 250.198 paragraph (e) is amended by adding an entry in
alphanumerical order in the table for API RP 2I, ``In-Service
Inspection of Mooring Hardware for Floating Drilling Units'', and
revising the entry for API RP 2A-WSD to read as follows:
Sec. 250.198 Documents Incorporated by Reference.
* * * * *
(e) * * *
------------------------------------------------------------------------
Title of documents Incorporated by reference at
------------------------------------------------------------------------
* * * * * * *
API RP 2A WSD, Recommended Practice for Sec. 250.901(a)(4); Sec.
Planning, Designing, and Constructing 250.908(a); Sec.
Fixed Offshore Platforms--Working 250.919(c)(2); Sec.
Stress Design; Twenty-first Edition, 250.920(a)(b)(c)(e).
December 2000 (API Order No. G2AWSD).
* * * * * * *
API RP 2I, In-Service Inspection of Sec. 250.901(a)(6).
Mooring Hardware for Floating Drilling
Units, February 1, 1997.
------------------------------------------------------------------------
4. Section 250.199 paragraph (e) is amended by adding an entry for
Form MMS-143, Facility/Equipment Damage Report, as follows:
Sec. 250.199 Paperwork Reduction Act statements--information
collection.
* * * * *
(e) * * *
------------------------------------------------------------------------
30 CFR 250 subpart/title (OMB control Reasons for collecting
No.) information and how used
------------------------------------------------------------------------
* * * * * * *
(26) Form MMS-143, Facility/Equipment This information will allow MMS
Damage Report, Subpart A (1010-0114). to rapidly assess damage and
project any disruption of oil
and gas production from the
OCS after a major natural
occurrence.
------------------------------------------------------------------------
5. Section 250.900 paragraph (e) is revised to read as follows:
Sec. 250.900 What general requirements apply to all platforms?
* * * * *
(e) You must submit notification of the platform installation date,
and the final as-built location data, to the
[[Page 37879]]
Regional Supervisor within 45 calendar days of completion of platform
installation. MMS will cancel your approved platform installation
permits 1 year after the approval is granted if the platform is not
installed. If MMS cancels your permit approval, you must resubmit your
application.
6. In section 250.901 paragraph (a), the following changes are
made:
A. Redesignate paragraphs (a)(6) through (a)(20) as (a)(7) through
(a)(21), respectively.
B. Add new paragraph (a)(6) to read as follows:
Sec. 250.901 What industry standards must your platform meet?
(a) * * *
(6) API RP 2I, In-Service Inspection of Mooring Hardware for
Floating Drilling Units, (incorporated by reference as specified in
Sec. 250.198);
* * * * *
7. Section 250.905 is amended by redesignating current paragraphs
(i) and (j), as paragraphs (j) and (k) respectively, and adding new
paragraph (i) to read as follows:
Sec. 250.905 How do I get approval for the installation,
modification, or repair of my platform?
* * * * *
----------------------------------------------------------------------------------------------------------------
Required documents Required contents Other requirements
----------------------------------------------------------------------------------------------------------------
* * * * * * *
(i) Summary of safety factors utilized. A summary of pertinent You must submit one copy.
derived factors of safety
against failure for major
structural members, e.g.,
unity check ratios
exceeding 0.85 for steel-
jacket platform members,
indicated on ``line''
sketches of jacket
sections.
* * * * * * *
----------------------------------------------------------------------------------------------------------------
8. Section 250.911 is amended by redesignating current paragraphs
(d) through (g), as paragraphs (e) through (h), respectively, and
adding new paragraph (d) to read as follows:
Sec. 250.911 If my platform is subject to the Platform Verification
Program, what must I do?
* * * * *
(d) Submit a complete schedule of all phases of design,
fabrication, and installation for the Regional Supervisor's approval.
You must include a project management timeline [Gantt Chart] that
depicts when interim and final reports required by Sec. Sec. 250.916,
250.917, and 250.918 will be submitted to the Regional Supervisor for
each phase. On the timeline, you must break out the specific scopes of
work that inherently stand alone (e.g., deck, mooring systems, tendon
systems, riser systems, turret systems).
* * * * *
9. Section 250.916(c) is revised to read as follows:
Sec. 250.916 What are the CVA's primary duties during the design
phase?
* * * * *
(c) The CVA must submit interim reports and a final report to the
Regional Supervisor, and to you, during the design phase in accordance
with the approved schedule required by Sec. 250.911(d). In each
interim and final report the CVA must:
(1) Provide a summary of the material reviewed and the CVA's
findings;
(2) Make a recommendation that the Regional Supervisor either
accept, request modifications, or reject the proposed design;
(3) Describe the particulars of how, by whom, and when the
independent review was conducted; and
(4) Provide any additional comments the CVA may deem necessary.
10. Section 250.917(c) is revised to read as follows:
Sec. 250.917 What are the CVA's primary duties during the fabrication
phase?
* * * * *
(c) The CVA must submit interim reports and a final report to the
Regional Supervisor, and to you, during the fabrication phase in
accordance with the approved schedule required by Sec. 250.911(d). In
each interim and final report the CVA must:
(1) Give details of how, by whom, and when the independent
monitoring activities were conducted;
(2) Describe the CVA's activities during the verification process;
(3) Summarize the CVA's findings;
(4) Confirm or deny compliance with the design specifications and
the approved fabrication plan;
(5) Make a recommendation to accept or reject the fabrication; and
(6) Provide any additional comments that the CVA deems necessary.
11. Section 250.918(c) is revised to read as follows:
Sec. 250.918 What are the CVA's primary duties during the
installation phase?
* * * * *
(c) The CVA must submit interim reports and a final report to the
Regional Supervisor, and to you, during the installation phase in
accordance with the approved schedule required by Sec. 250.911(d). In
each interim and final report the CVA must:
(1) Give details of how, by whom, and when the independent
monitoring activities were conducted;
(2) Describe the CVA's activities during the verification process;
(3) Summarize the CVA's findings;
(4) Confirm or deny compliance with the approved installation plan;
(5) Make a recommendation to accept or reject the installation; and
(6) Provide any additional comments that the CVA deems necessary.
12. Section 250.919 is amended by revising paragraph (a), and
adding new paragraphs (c) and (d) to read as follows:
Sec. 250.919 What in-service inspection requirements must I meet?
(a) You must submit a comprehensive annual in-service inspection
plan covering all of your platforms to the Regional Supervisor for
approval by April 1 of each year. As a minimum, your plan must:
(1) Address the recommendations of the appropriate documents listed
in Sec. 250.901(a);
(2) Specify the type, extent, and frequency of in-place inspections
which you will conduct for both the above-water and the below-water
structure of all platforms and pertinent components of the mooring
systems for floating platforms; and
(3) Address how you are monitoring the corrosion protection for
both the above water and below water structure.
* * * * *
(c) If any of your structures have been exposed to a natural
occurrence (e.g., hurricane, earthquake, or tropical storm), the
Regional Supervisor may require you to submit an initial report,
[[Page 37880]]
followed by subsequent updates, that includes the following:
(1) A list of affected structures;
(2) A timetable for conducting the inspections described in section
14.4.3 of API RP 2A-WSD (incorporated by reference as specified in
Sec. 250.198); and
(3) An inspection plan for each structure that describes the work
you will perform to determine the condition of the structure.
(d) The Regional Supervisor may also require you to submit the
results of the inspections referred to in paragraph (c)(2) of this
section, including a description of any detected damage that may
adversely affect structural integrity, an assessment of its ability to
withstand any anticipated environmental conditions, and any remediation
plans. Under Sec. Sec. 250.900(b)(3) and 250.905, you must obtain
approval from MMS before you make major repairs of any damage.
13. Section 250.920 is revised to read as follows:
Sec. 250.920 What are the MMS requirements for assessment of
platforms?
(a) You must perform a platform assessment when platform assessment
initiators exist. Platform assessment initiators are listed in Sections
17.2.1-17.2.5 of API RP 2A-WSD (incorporated by reference as specified
in Sec. 250.198).
(b) You must document all wells, equipment, and pipelines supported
by the platform if you intend to use the medium or low consequence-of-
failure exposure category for your assessment. Exposure categories are
defined in API RP 2A-WSD Section 1.7. You must obtain approval from the
Regional Supervisor before assessing your platform to either the medium
consequence-of-failure or low consequence-of-failure exposure category.
(c) You must perform a complete platform structural assessment
analysis when your platform assessment indicates that the platform is
damaged; the deck height is inadequate; loading is significantly
increased; or the exposure category changes to a more restrictive
level.
(d) You must initiate mitigation actions for platforms that do not
pass the assessment process of API RP 2A-WSD. Your mitigation actions
must be approved by the Regional Supervisor.
(e) MMS may require you to conduct a platform assessment where the
reduced environmental loading criteria contained in API RP 2A-WSD
Section 17.6 are not allowed.
(f) By November 1 of each year, you must submit a complete list of
all the platforms you operate, together with all the appropriate data
to support the consequence-of-failure category you assign to each
platform and the platform assessment initiators (as defined in API RP
2A-WSD) to the Regional Supervisor.
(g) The use of Section 17, Assessment of Existing Platforms, of API
RP 2A-WSD is limited to existing fixed structures that are serving
their original approved purpose and were designed in accordance with
the provisions in the 19th or earlier edition of API RP 2A-WSD. You
must obtain approval from the Regional Supervisor for any change in
purpose of the platform, following the provisions of API RP 2A-WSD,
Section 15, Re-use.
14. Section 250.1007 is amended by revising paragraph (a)(4) to
read as follows:
Sec. 250.1007 What to include in applications.
(a) * * *
(4) A description of any additional design precautions you took to
enable the pipeline to withstand the effects of water currents, storm
or ice scouring, soft bottoms, mudslides, earthquakes, permafrost, and
other environmental factors.
(i) If you propose to use unbonded flexible pipe, your application
must include:
(A) The manufacturer's design specification sheet;
(B) The design pressure (psi);
(C) An identification of the design standards you used; and
(D) A review by a third-party independent verification agent (IVA)
according to API Spec 17J (incorporated by reference as specified in
Sec. 250.198), if applicable.
(ii) If you propose to use one or more pipeline risers for a
tension leg platform or other floating platform, your application must
include:
(A) The design fatigue life of the riser, with calculations, and
the fatigue point at which you would replace the riser;
(B) The results of your vortex-induced vibration (VIV) analysis;
(C) An identification of the design standards you used; and
(D) A description of any necessary mitigation measures such as the
use of helical strakes or anchoring devices.
* * * * *
[FR Doc. E6-10401 Filed 6-30-06; 8:45 am]